都江堰二王庙512震后修复工程
释义
都江堰二王庙512震后修复工程
Encyclopedia
工学
〔重要工程项目〕
释
the restoration project of Dujiangyan Erwangmiao After the 512 Earthquake
都江堰二王庙512震后修复工程
中国都江堰二王庙在2008年5月12日发生里氏8.0级地震后,第一时间开展的抢险修复工作。作为世界文化遗产“都江堰-青城山”的标志性古建筑群,二王庙在此次地震中文物等级最高,被国家文物局列为首批重点项目。2008年6月底正式开工修缮,历时两年半完成。
随便看
closed-loop controlled circuit
closed loop control principle
closed-loop control systems
closed loop evaluation and reporting
closed loop experiment
closed loop guidance
closed loop orbit
closed-loop pressurization
closed loop servo system
closed loop supply chain
closed-loop supply chain
closed loop system
closed loop test
closed-loop test of flight control system
closed-loop vector method
closed magnet unit
closed manifold
closed mapping
closed mixed-refrigerant cycle liquefaction process
closed model
Closed Mondays
closed monoidal category
closed morphism
closed motor skill
closed n-ball
科学参考收录了854744条科技类词条,基本涵盖了常见科技类参考文献及英语词汇的翻译,是科学学习和研究的有利工具。
Copyright © 2000-2023 Sciref.net All Rights Reserved
京ICP备2021023879号
更新时间:2025/4/6 10:41:16