请输入您要查询的字词:
单词
地下开采基建进度计划
释义
地下开采基建进度计划
Encyclopedia
工学
地下开采设计
释
underground mining construction schedule planning
地下开采基建进度计划
为保证地下矿山按计划有步骤地投入生产,并在投产后能连续均衡地进行生产,从矿山基建井巷掘进破土之日开始,一直到投产或矿山达到设计规模为止而编制的计划。
随便看
highway mileage
highway network monitoring and management system
highway network operation state
highway network structure
highway network structure planning methods
highway noise pollution and prevention
highway pavement
Highway Port of Suifenhe
highway runway
highway safety audit
highway safety enhancement project
highway sand prevention
highway service facilities
highway subgrade
highway survey
Highway technical grade
highway technology status evaluation
highway timber transportation
highway traffic detection
highway traffic indication
Highway traffic radio
highway traffic sign
highway transporter for spacecraft
highway transport model
highway transport vehicle for missile
科学参考收录了854744条科技类词条,基本涵盖了常见科技类参考文献及英语词汇的翻译,是科学学习和研究的有利工具。
Copyright © 2000-2023 Sciref.net All Rights Reserved
京ICP备2021023879号
更新时间:2026/10/6 5:08:11