地下开采基建进度计划
释义
地下开采基建进度计划
Encyclopedia
工学
地下开采设计
释
underground mining construction schedule planning
地下开采基建进度计划
为保证地下矿山按计划有步骤地投入生产,并在投产后能连续均衡地进行生产,从矿山基建井巷掘进破土之日开始,一直到投产或矿山达到设计规模为止而编制的计划。
随便看
hydrologic regionalization in China
hydrologic resource map
hydrologic risk
hydrologic statistic parameters
hydrologic statistics
hydrologic statistic sample
hydrologic technical regulation
hydrologic time series analysis
hydrologic winch
hydrologic year
hydrologic yearbook
Hydrology
hydrology
hydrology in ancient China
hydrology planning
hydrology regulation of wetland
hydrolysable tannin
hydrolysable tannins
hydrolysis
hydrolysis constant
hydrolysis degree
hydrolysis equilibrium constant
hydrolysis of plant biomass
hydrolysis of polymer
hydrolysis process of metal ion for leaching liquid of mineral material
科学参考收录了854744条科技类词条,基本涵盖了常见科技类参考文献及英语词汇的翻译,是科学学习和研究的有利工具。
Copyright © 2000-2023 Sciref.net All Rights Reserved
京ICP备2021023879号
更新时间:2026/8/25 23:15:56