请输入您要查询的字词:
单词
planning verification after the completion of the construction project
释义
planning verification after the completion of the construction project
Encyclopedia
工学
城乡规划行政职权
释
planning verification after the completion of the construction project
建设工程竣工后的规划核实
建设工程竣工验收之前,城乡规划主管部门进行的建设工程是否符合规划许可的检验。
随便看
cold damage of high pour point crude reservoir
cold-dampness disturbing spleen
cold dark matter
cold dark matter model
Cold Dew
cold dew wind in rice
cold discharge
cold dish
cold dish room
cold drawing
cold-drawing
cold drawing; cold stretching
colddrawn
cold drawn low carbon steel wire
cold effect
cold electrode
cold emission
cold event at 8.2kaBP
cold extruding
cold extrusion
cold filament in the South China Sea
cold filter of fish oil
cold filter plugging point
cold finger
cold fission
科学参考收录了854744条科技类词条,基本涵盖了常见科技类参考文献及英语词汇的翻译,是科学学习和研究的有利工具。
Copyright © 2000-2023 Sciref.net All Rights Reserved
京ICP备2021023879号
更新时间:2025/12/27 23:06:47